Part-number card (generic family drawing, not a photo of the part).
BOMAG · Filters
Air filter BOMAG 05821147
Short answer
The 05821147 is a BOMAG part: air filter. Our records match it to the BW211D-40. We quote it in El Salvador and Guatemala: send us the part number and your machine's serial.
Quote or order it in your country
The part number is already in the message. Have your machine's serial handy.
El Salvador
Guatemala
What it does
Traps dust and particles before air reaches the engine. A clogged air filter robs the machine of power and raises fuel use; a damaged one lets abrasive dirt straight into the cylinders.
Part data
- Part number
- 05821147
- Brand
- BOMAG
- System
- Filters
- Catalog description
- ELEMENTO FILTRANTE,AIRE
- Equivalents and supersessions
- No equivalents on record. If the number was superseded, your specialist gives you the current one.
Compatible models
- BW211D-40ConstruMarket After-sales maintenance plan (Guatemala, Jul-2024)
Within a model the part can change by serial number: confirm it with the serial on the data plate.
When to replace it
| Model | Interval |
|---|---|
| BW211D-40 | every 250 h |
Source: ConstruMarket After-sales maintenance plan (Guatemala, Jul-2024). Your machine's Operation and Maintenance Manual and working conditions (dust, fuel, load) come first.
Maintenance plansFrequently asked questions
How do I order the 05821147?
Pick your country under “Order it in your country” and message us on WhatsApp or with the form: the part number is already filled in. We confirm price and availability. We serve it in El Salvador and Guatemala.
Does the 05821147 fit my machine?
Our records match it to: BW211D-40. Within the same model the part can change by serial number, so send us the serial from the data plate and we confirm before quoting.
Is there an online price?
For now it is quoted: price depends on the country and same-day availability, and we give it to you in writing.
How often is the 05821147 replaced?
In our maintenance plan: BW211D-40, every 250 hours. Your machine's Operation and Maintenance Manual and working conditions always come first.
