Taking the structure down without taking the machine down
High-reach demolition
“I have to take down a building and the machine cannot reach the upper floors”
A high-reach demolition front with reinforced guarding and the right tool — pulveriser, shear or breaker — on a base sized to take the duty cycle. Vertical reach is defined by the real height of what has to come down.
Where it is used
The jobs it solves
- High-rise building demolition
- Concrete recycling and steel separation
- Industrial dismantling
- Steel structure cutting
Vertical reach is defined by the real height of what comes down, and guarding by what falls. Both get measured on site.
It arrives as one machine, with one point of responsibility
A single point of responsibility
The base machine, the special configuration and the commissioning arrive as one machine delivered by the group. No finger-pointing between suppliers when something fails.
Local support for the base machine
It is a Komatsu: parts, workshop and certified technicians in El Salvador, Guatemala, Nicaragua and Panama, with the same KOMTRAX telematics as the rest of the fleet.
Sized against the project
Reach, depth and soil type govern, not a catalog. It is defined in a technical visit and quoted against the real job, not against a list of options.
Other configurations
Long-reach excavator
Reach without entering the water
Amphibious excavator
Where a standard undercarriage sinks
Forestry and timber handling
From the bush to the log yard
Material and scrap handling
Seeing inside the container
Pedestal boom system
The machine that doesn't move
Amphibious carrier
Getting the spoil out of the swamp
Tell us the job, not the machine
What has to be moved, at what depth, over what ground and for how long. With that we define the base machine and the configuration, and the proposal comes back against the real job.
Request a technical visit