Skip to content
Grupo ConstruMarket

Greasing that does not depend on someone remembering

Automatic lubrication system

“The operator doesn't grease the machine and the pins are wearing out”

A pump and a network of lines grease pins and bushings on programmed cycles, with the machine working. The operator stops climbing down to grease — and stops skipping it when in a hurry — and every point gets the right amount at the right interval, not a burst on Mondays and nothing the rest of the week. It fits excavators, loaders, trucks and fixed plant equipment as well.

Request a technical visitConfigured to order
Automatic lubrication diagram: a pump with a reservoir feeds boom, arm and bucket pins through lines on programmed cycles, while the machine works

Where it is used

The jobs it solves

  • Fleets running double shifts or around the clock
  • Operations with constant dust or water, where grease washes out
  • Machines at remote faces, far from the workshop
  • Machines with many hard-to-reach grease points
  • Fixed plant equipment that does not stop for maintenance

What lasts longer is not the grease: it is the pin and the bushing. Play in the joints shows up late, and by then it has been paid for in workshop hours and lost precision. The number of points and the grease type are defined per machine.

It arrives as one machine, with one point of responsibility

  • A single point of responsibility

    The base machine, the special configuration and the commissioning arrive as one machine delivered by the group. No finger-pointing between suppliers when something fails.

  • Local support for the base machine

    It is a Komatsu: parts, workshop and certified technicians in El Salvador, Guatemala, Nicaragua and Panama, with the same KOMTRAX telematics as the rest of the fleet.

  • Sized against the project

    Reach, depth and soil type govern, not a catalog. It is defined in a technical visit and quoted against the real job, not against a list of options.

Tell us the job, not the machine

What has to be moved, at what depth, over what ground and for how long. With that we define the base machine and the configuration, and the proposal comes back against the real job.

Request a technical visit
Get a quote