Skip to content
Grupo ConstruMarket

Height is the constraint

Underground mining

“The machine does not fit the drift, it hits the back”

Komatsu Mining — formerly Joy Global — builds the full underground line: 3-, 4- and 7-tonne LHD loaders designed for narrow veins, plus the ZJ21 drill jumbo and the ZB21 bolter, which work in drifts of about 3 metres. Here the constraint is not force: it is how tall and how wide the machine is.

Request a technical visitConfigured to order
Komatsu WX03 underground loader with a bucket full of ore inside a mine drift
LHD loaders
WX03 · WX04 · WX07
Bucket capacity
1.5 – 4.4 m³
Canopy height
1,938 – 2,169 mm
Jumbo and bolter · width
ZJ21 · ZB21 · 1.7 m

Where it is used

The jobs it solves

  • Loading and hauling ore in narrow veins
  • Face drilling in development headings
  • Bolting and ground support from the cab
  • Drift clean-up and ramp maintenance

You measure the tunnel section first and pick the machine after — never the other way round. The figure to compare with the drift is each model's cab or canopy height, not a general catalogue number.

Komatsu ZJ21 drill jumbo with its drilling feed extendedTunnel section diagram: the standard machine hits the back; the low-profile build fits within the available clearance

It arrives as one machine, with one point of responsibility

  • A single point of responsibility

    The base machine, the special configuration and the commissioning arrive as one machine delivered by the group. No finger-pointing between suppliers when something fails.

  • Local support for the base machine

    It is a Komatsu: parts, workshop and certified technicians in El Salvador, Guatemala, Nicaragua and Panama, with the same KOMTRAX telematics as the rest of the fleet.

  • Sized against the project

    Reach, depth and soil type govern, not a catalog. It is defined in a technical visit and quoted against the real job, not against a list of options.

Tell us the job, not the machine

What has to be moved, at what depth, over what ground and for how long. With that we define the base machine and the configuration, and the proposal comes back against the real job.

Request a technical visit